Skip to main content
Back to Blog

Buying Land and Building in Accra: Land Guards, Fees and Fixes

November 22, 2026Punctum Engineering Team9 min read

You bought the plot. The papers are in order. The surveyor has set the beacons and the contractor is ready to mobilise. Then a group of young men arrives at the site and says nothing can start until you pay a "digging fee."

This happens on Accra building sites all the time. Sometimes it ends with a payment and a sour feeling. Sometimes it ends far worse: in one reported Ga South case, a dispute over a GH¢4,000 digging fee at a construction site ended with one person dead and three injured (Yen).

We have dealt with this on real projects. This article explains where the trouble comes from, how to tell a genuine customary obligation from a shakedown, and what the government, the police and building professionals can each do to reduce the friction. It also covers what you can do yourself before you buy.

Why Building in Accra Is Hard

Multiple Sales and Weak Land Records

Many Accra plots have a complicated history. Family, stool and chieftaincy disputes overlap, and one plot can be sold to more than one buyer. Greater Accra's regional minister has said the region ranks high in land litigation and related violence, which he linked mostly to land guards (Graphic).

Court cases are slow. A buyer who ends up in a dispute should expect a long process, and some give up.

Permit Delays

You need a development permit before you build. For the Accra Metropolitan Assembly, the guidelines list proof of land ownership from the Lands Commission, a completed application form and four copies of the building drawings (AMA). Our guide to the building permit process in Ghana walks through the steps.

Officials have set timelines before. A regional minister directed that approvals should not exceed three months, and a deputy minister has said an electronic system should cut the wait to about 30 days. In the past, a single permit could take far longer (Graphic). Timelines change, so confirm the current one with your assembly before you plan around it.

Delay matters for a reason beyond lost time. A plot with no permit and no visible paperwork looks like an easy target. One Ashongman developer complained that land guards operate where there is no building permit and no title (News Ghana).

Land Guards: Who They Are and What They Do

"Land guard" is the common name for groups who claim to protect a plot and then use pressure to get paid. Typical tactics are:

  • Turning up at the site when work starts and demanding payment.
  • Blocking workers or materials from entering.
  • Claiming the plot belongs to someone else.
  • Selling the same plot again.

Reports have come from Kokrobite, Ashongman, Abokobi and Appolonia, among other places. The Institution of Surveyors has said land guard activity pushes up the cost of housing (MyJoyOnline). Every delay and every payment lands on the final cost of the building.

Digging Fees Explained

A "digging fee" is money demanded at the start of work, supposedly for permission to dig foundations. Reported demands run from about GH¢1,500 to GH¢4,000, and some end in violence.

Here is the part most articles skip. Not every payment demanded at the start of a project is the same thing, and treating them all alike is a mistake.

A Customary Obligation Is Not a Shakedown

In some communities there are real traditional processes tied to land. A buyer may owe recognition to the family or the traditional authority connected to the land. That is part of how land has worked in Ghana for generations.

In Ga areas, those traditional authorities are the Asafoatse. Many developers first meet them at the start of a project, when they learn that the land sits within an area the Asafoatse have authority over.

We have been through this. On one project we complied with the Asafoatse. We told the client beforehand what to expect and why. Then we worked to find the right people to give the money to, so the payment went to the legitimate party and not to whoever shouted loudest. That kept the project moving and avoided the headaches that come with paying the wrong people.

Three things made that work:

  1. The client knew in advance. Nobody was surprised mid-project, and the client agreed to the approach.
  2. We identified the right recipients. Among the Asafoatse and the people around them, knowing who is the real authority matters. Paying the wrong person does not close the matter. It invites the next demand.
  3. The title and paperwork were already sound. We were dealing with a customary courtesy on a plot with clean documents, not paying off a false claim.

Telling a Courtesy from a Shakedown

Ask these questions when a demand arrives:

  • Who is asking, and on whose authority? A genuine traditional authority can be identified and will be known to the community and to your lawyer.
  • Does the demand match your title? If your search and survey are clean and strangers claim the land, that is a red flag.
  • Is there pressure or a threat? Genuine customary processes do not need threats, stopped workers or intimidation.
  • Is the amount arbitrary? Be wary of figures that appear from nowhere and rise when you hesitate.
  • Can you get a receipt and a name? Anyone with a legitimate claim can give you both. Be suspicious of anyone who refuses.

This is not legal advice. Get your lawyer involved before you pay anyone anything.

When It Is a Shakedown, Report It

On another project, it was obvious the demand was a shakedown. We reported it to the police. The police got involved and the "land guards" were arrested.

That outcome is not guaranteed, and every case differs. But it shows that reporting works, especially when the client has clean documents and a professional team that can state the facts plainly. Paying a group like that would only have marked the site as one that pays.

If you are asked for a digging fee with no clear authority behind it:

  1. Do not hand over money on the spot.
  2. Record who came, what they said and when. Photos and notes help.
  3. Call your lawyer and your surveyor.
  4. Report to the police, and give them your documents.
  5. Pause workers if safety is at risk. A delayed day is cheaper than an injury.

What the Law Says and What the Police Are Doing

Ghana has laws aimed at this problem:

  • The Land Act 2020 (Act 1036) prohibits land guard activity. It has been reported to carry a jail term of 5 to 15 years (GhanaWeb, Citi Newsroom).
  • The Vigilantism and Related Offences Act, 2019 (Act 999) outlaws forming, promoting, training and funding vigilante groups, and has been used in land guard cases.

The police have an Anti-Landguard Unit. Police have said they will pursue the sponsors who hire land guards as well as the guards themselves. Court reports show suspects being charged and granted bail (GNA).

The picture is not all positive. Some land owners have complained about how police and Lands Commission officials behave in land disputes (MyJoyOnline). The laws exist. Applying them consistently is the harder part.

How Each Party Can Reduce Friction

Government

  • Faster, clearer permitting. The electronic permit system is the right idea. Its value depends on actually delivering the promised timelines.
  • Reliable land records. Most disputes start with unclear ownership. Better registration and searchable records would shrink the problem at its source.
  • Consistent enforcement. Penalties only deter if people see them applied.

Police

  • Fast response to site complaints. A developer facing intimidation needs help the same day.
  • Go after the sponsors. Arresting foot soldiers while the people who hire them go free changes little.
  • A clear complaint route. Builders should know where to report and what to bring.
  • Training on land matters. Officers who understand title and customary land can tell a shakedown from a genuine dispute.

Industry Professionals

  • Lawyers run the title search, check the chain of ownership and advise before any payment.
  • Surveyors establish and mark boundaries so the plot is defined on the ground. See our land survey service.
  • Architects and engineers prepare permit-ready drawings so the application does not stall. See our architectural, structural and MEP design services.
  • Contractors should not mobilise until due diligence is finished.
  • Project managers coordinate all of these, brief the client early, and know who to call when something goes wrong. See our construction project management service.

Our own experience points to the same lesson twice. Telling the client early and finding the right people made the customary payment smooth. Documenting the facts and going to the police made the shakedown stop. In both cases, preparation did the work.

A Practical Checklist Before You Buy and Build

  1. Search the title at the Lands Commission.
  2. Hire a surveyor and confirm the boundaries on the ground.
  3. Check zoning and planning. A site can be legally acquired from a traditional authority and still conflict with zoning or planned infrastructure.
  4. Ask your lawyer about customary obligations to the family or traditional authority, and agree the approach with your team before you start.
  5. Apply for the permit with proof of ownership, the application form and four sets of drawings. A permit is valid for five years.
  6. Secure the site before workers arrive.
  7. Brief your client and your team on what could happen and who handles it.
  8. Keep every receipt, name and message.

Frequently Asked Questions

Are land guards illegal in Ghana?

Yes. The Land Act 2020 (Act 1036) prohibits land guard activity, and Act 999 has been used against groups involved in vigilantism. Check the current text of both with your lawyer.

What is a digging fee, and should I pay it?

It is a payment demanded at the start of construction. Some payments are genuine customary obligations to the right traditional party. Many are extortion. Do not pay anyone on the spot. Identify who is asking, involve your lawyer, and report threats to the police.

How long does a building permit take in Accra?

Officials have given targets of 30 days to three months, but real timelines have been longer. Ask your assembly for the current timeline.

What documents do I need to build in Accra?

For the AMA, proof of land ownership from the Lands Commission, an application form and four copies of building drawings.

What should I do if land guards stop my project?

Stay safe, record the details, call your lawyer and surveyor, and report to the police with your documents.

Can I build while a land dispute is in court?

Speak to a lawyer first. Building on a disputed plot carries serious risk, and a court may restrict work.

Conclusion

Buying land and building in Accra means managing three things: the law, enforcement, and your own preparation. The law is there. Enforcement is improving but uneven. Preparation is the part you control.

Clean title, a surveyed boundary, a permit and a team that tells you the truth early will not remove every problem. They do change which problems you face and how you handle them.

If you are planning to buy land or start a build in Accra, talk to Punctum before you pay for the plot. We can review the title, survey and permit position, and tell you what to expect on the ground.

buying land and building in accraland guards accradigging feesbuilding permit accraland title due diligence ghana

Ready to Start Your Project?

Tell us about the home you want to build — we respond within one business day.

Chat on WhatsApp